
CERREJON FEASIBILITY STUDY
FLSmidth
Columbia
Client:
FLSmidth
Sector:
Materials Handling, Infrastructure
Our Role:
Engineering & Design
Overview:
The Project consisted of a preliminary basic engineering package and a +/-15 – 20% cost estimate for the Zona Norte and Zona Central Coal Conveying Projects at the existing mine located in Colombia. The Civil, Structural and Infrastructure portion of the feasibility study was provided for FLSmidth. The feasibility was to evaluate the upgrade from 32MTPA to 40MTPA in phase 1 and an upgrade to 45MTPA for phase 2. (Million tons per annum).
FEATURED PROJECTS









Subscribe To Our Newsletter
Join our mailing list to receive the latest news and updates from our team.
You have Successfully Subscribed!