
VELE COLLIERY PHASE 1 & 2 – COAL PROCESSING PLANT
ELB Engineering
South Africa
Client:
ELB Engineering
Sector:
Materials Handling, Mineral Processing
Our Role:
Engineering & Design
Overview:
Civil and Infrastructure Design and Detailing of a 0,5MTPA Coal Processing Plant and an upgrade to 1MTPA for Phase 2. The plant consisted of a Washing plant (coking coal), Primary; Secondary and Tertiary crushing, Modular 170 TPH de-stoning wash plant, Modular 340 ton per hour (TPH) secondary wash plant, Modular 100 TPH spiral plant, Product storage, 5 Stockpile reclaim tunnels, Slimes thickener, Power generation, Access and internal roads, offices, workshops and stores.
FEATURED PROJECTS








